Tools Preparation
Steel Ruler, Tape Measure, Wallpaper Knife, Rubber Hammer
Preparation
Before paving the SPC floor, make sure the ground is flat and completely dry, and sweep the ground clean.
Before installation, the product needs to be placed flat for 48 hours to adapt to the environment. A moisture-proof mat can also be laid on the ground.
Installation Steps
1. Check the floor first, then put the tenoned side against the wall, and leave a 4-10mm expansion joint between the floor and the wall. Start paving from the corner of the wall, follow the order from inside to outside, and from left to right.
2. The first floor in the second row is installed on the long side as shown in Figure 2. Insert the tenon of the floor to be laid into the groove of the first row of floor and lift the floor slightly at an angle of 20 degrees until the joint position is pressed down level the floor so that it fits snugly.
3. Like the other floors, the continued floor should be wedged in the correct position lengthwise as above.
4. When wedging in the longitudinal direction, the distance between the front part of the board and the neighbour board should be as small as possible, and then use the beating board to strike the short side horizontally to make them join together. The specially designed lock will be automatically locked together.
Aftercare
Daily just scrub with water. Easy to clean and save maintenance costs
Notice
When calculating the floor demand according to the building area, the loss is generally 5%. If installed at a certain angle, the loss is generally 10~15%
Scope of Application
There is no need to build keels, no need to add cement and sand, no need to remove the original floor. SPC can be directly paved on the ground.